Future roadwork
MnDOT will resurface, repair and update Hwy 23 between Hwy 15/Stearns Co. Rd. 75/Second St. S and Crossing Dr. west of I-94 in the Waite Park/St. Cloud area in 2028-2029.
Project highlights
- Resurface both directions(mill and overlay asphalt), includes turn lanes and shoulders between:
- Hwy 15/Co. Rd. 75 and 17th Ave. S
- I-94 and Crossing Dr.
- Reconstruct both directions (full depth reclamation), includes turn lanes and shoulders between:
- 17th Ave. S and I-94
- Replace five signal systems at Waite Ave. S, Second. Ave. S, Sixth Ave. S, 10th Ave. S and 28th Ave. S
- Update pedestrian sidewalk, curbs and ramp approaches between Hwy 15/Co. Rd. 75 and 17th Ave. S, and pedestrian ramps at 28th Ave. S
- Close median crossover and make right in/out access at Park Ave. S
- Replace lighting and medians between Hwy 15/Co. Rd. 75 and 17th Ave. S
- Update road markings, mumble/rumble strips and signage
- Make other repairs, as warranted
Information tentative and subject to change.