Public Meetings
Upcoming Opportunities
Luverne Chamber of Commerce - Love the Business meeting
        August 28, 2025
        8:30 - 9:30 a.m.
        Luverne Loop Trailhead
      (601 E. Main St., Luverne)
MnDOT will present a Hwy 75 project overview to Luverne Chamber of Commerce businesses at their Love the Business meeting. Staff will provide a summary of work, review construction timing, and highlight detour routes, as well as be available for questions.
Luverne Farmers Market
August 28, 2025
 
4 - 7 p.m.
Redbird Field
      (209 Redbird Rd., Luverne)
MnDOT will be in attendance at the Luverne Farmers Market with Hwy 75 project information to share, including project one-pagers and detour maps.
Past Opportunities
Public Notice and Opportunity for Comment
      September 26, 2024 - October 11, 2024
The Minnesota Department of Transportation (MnDOT) proposes  to reconstruct US 75 from West Main Street to Veteran’s Drive within city of  Luverne. MnDOT is in the design phase of replacing the entire road within this  corridor. The project will replace the existing bituminous road and reconstruct  a new concrete road for the roughly 1.16-mile section, as well as improvements  to water and sewer infrastructure. This project will result in wider shoulders,  improved bicycle and pedestrian mobility, and improved vehicle turning  clearance at intersections. The intersection of US 75 and West Main Street will  be modified to accommodate vehicles with wider turning radius and improve the  pedestrian crossing systems. In doing this, a portion of the city’s Flag Park  will be impacted. 
        In accordance with 23 CFR 774.5, MnDOT is soliciting  comments on the effects this project would have on Flag Park. The project will  temporarily impact 0.11 acre of the park and permanently impact 0.02 acre of  the northwestern edge of the park. 
The Federal Highway Administration has made a preliminary determination that the proposed action at Flag Park is a Section 4(f) de minimis action in accordance with 23 CFR 774.5, conditioned on public review and comment. A de minimis finding may be made when uses of Section 4(f) land will have no adverse effect on the protected resources. Information on this impact and avoidance, minimization, mitigation or enhancement measures is available here.
MNDOT requested public comment on these impacts to Flag Park through October 11, 2024 (now closed). Comments were documented as part of the official record.
Open house
        Tuesday, April 23, 2024
 
        4 - 6 p.m.
 
Luverne Loop Trailhead
(601 E. Main St., Luverne)
MnDOT hosted an open house for the public to learn more about the Hwy 75 Luverne project, including roadway improvements, construction timeline, and detour routes.
