Documents
Maple Grove to Rogers
Findings of Fact and Conclusions
Minnesota Department of Transportation, Metro District
Released May 2019
Findings of Fact and Conclusions (PDF)
- Appendix A: Public Involvement - EA/EAW Comment Period (PDF)
- Appendix B: EA/EAW Comment and Responses (PDF)
- Appendix C: Figures (PDF)
- Appendix D: Recent Project Correspondence (PDF)
- Appendix E1: Additional and Updated Studies/Memoranda (PDF)
- Appendix E2: Environmental Management Plan (PDF)
- Appendix E3: Updated Wetland Two Part Findings (PDF)
Findings of No Significant Impact
Minnesota Department of Transportation, Metro District
Released May 9, 2019
The Federal Highway Administration issued a Findings of Non Significant Impact report May 9, 2019, for construction being done from Maple Grove to Rogers. A copy can be obtained by contacting us.
Environmental Assessment Worksheet
Minnesota Department of Transportation, Metro District
Released January 2019
Environmental Assessment Cover Letter (PDF)
Environmental Assessment (PDF)
- Appendix A: Figures (PDF)
- Appendix B: Technical Memo - Purpose and Need (PDF)
- Appendix C: Technical Memo - Alternatives Analysis (PDF)
- Appendix D: Trail Lifted Use Permits and Section 6(f) Coordination (PDF)
- Appendix E: DNR Correspondence (PDF)
- Appendix F: NRCS Farmland Conversion (PDF)
- Appendix G: Well Logs (PDF)
- Appendix H: Wetland Assessment and Two-Part Finding (PDF)
- Appendix I: Phase I Environmental Site Assessment (PDF)
- Appendix J: Section 7 Coordination (PDF)
- Appendix K: Cultural Resources Studies and Approvals (PDF)
- Appendix L: Technical Memo - Environmental Justice Analysis (PDF)
- Appendix M: Model Methodology Memo (PDF)
- Appendix N: Traffic Noise Study Report (PDF)
- Appendix O: Air Analysis Report (PDF)
- Appendix P: Environmental Commitment Sheets (PDF)
- Appendix Q: Floodplain Assessment (PDF)
*If you would like to view the EAW in an alternate format, contact us.
St. Michael to Albertville
Findings of Fact and Conclusions
Minnesota Department of Transportation, Central Region - District 3
Released July 2018
Findings of Fact and Conclusions (PDF)
Environmental Assessment Worksheet
Minnesota Department of Transportation, Central Region - District 3
Released March 2018
Environmental Assessment Worksheet - Main content (PDF)
- Appendix A: Figures (PDF)
- Appendix B: Agency correspondence (PDF)
- Appendix C: Wetland impact assessment and two-part finding (PDF)
- Appendix D: Traffic noise analysis report (PDF)
*If you would like to view the EAW in an alternate format, contact us.
Monticello to Clearwater
Reevaluation of Environmental Assessment
Minnesota Department of Transportation, Central Region - District 3
Released August 2020
Reevaluation Environmental Assessment Document Memo (PDF)
Attachments:
- Proposed Alternative Unbonded Concrete Overlay/Reconstruction (PDF)
- Proposed Alternative Typical Section (PDF)
- Proposed Wetland Impact Exhibit (PDF)
- Wetland Two-Part Finding (PDF)
- Traffic Noise Analysis Report (PDF)
- Design Modification - Noise Screening Fence Exhibit (PDF)
*If you would like to view the document in an alternate format, contact us
Findings of Fact and Conclusions
Minnesota Department of Transportation, Central Region - District 3
Released May 2019
Findings of Fact and Conclusions (PDF)
Findings of No Significant Impact
Minnesota Department of Transportation, Central Region - District 3
Released May 8, 2019
The Federal Highway Administration issued a Findings of No Significant Impact report May 8, 2019, for construction being done from Monticello to Clearwater. A copy can be obtained by contacting Claudia Dumont at claudia.dumont@state.mn.us or 320-223-6530.
Environmental Assessment Worksheet
Minnesota Department of Transportation, Central Region - District 3
Released January 2019
Environmental Assessment Worksheet (PDF)
- Appendix A: Correspondence (PDF)
- Appendix B: Geometric Design Standard Tables (PDF)
- Appendix C: Traffic Report Summary Tables (PDF)
- Appendix D: Typical Sections of Build Alternatives (PDF)
- Appendix E: Regional Land Use and Zoning Maps (PDF)
- Appendix F: Noise Analysis Summary Table (PDF)
- Appendix G: Wetland Two-Part Finding (PDF)
- Appendix H: Environmental Commitments (PDF)
- Figure 6: US Geological Survey 7.5 Minute, 1:24,000 Scale Map (PDF)
- Figure 7: Existing Environmental Conditions, Proposed Project Impacts (PDF)
*If you would like to view the EAW in an alternate format, contact us.