About this 2025 project
Bridge open, work complete
MnDOT resurfaced and updated the Stearns Co. Rd. 137 bridge over Hwy 15 in Waite Park.
 
    Summary of work
 
    - Resurface the bridge deck (replace the concrete wearing coarse)
- Replace approach panels and joints, along with other bridge repairs
- Repaint the concrete structur
- Upgrade bridge railing and steel barrier approaches
- Pedestrian access:
      - Resurface shoulders, multi-use trail
 