2025 roadwork	  
	   
	    
	  
      Reconstruct, resurface and improve pedestrian features along the Hwy 12, Wright County, in these towns: 
      
  
    Howard Lake    
    2025 project complete    
    
    Summary of work
    
      - Resurface Hwy 12 with a new asphalt road surface from west of 13th Ave. to east of Sixth Ave. 
- Reconstruct or repair concrete curbs, gutters and entrances
- Improve and update pedestrian access:
        
          - Reconstruct segments of  sidewalks and ramp approaches between 13th Ave. and Sixth Ave.
            
              - Reconstruct and widen the sidewalk in a two block area in the downtown district between Ninth  Ave. and Seventh Ave.
- Update pedestrian crosswalk signal systems
 
 
Project home
  
	  
	    Waverly	    
	    
	    2025 project complete	    
	      A rectangular rapid flashing beacon warns motorists that pedestrians are within the crosswalk
	      A rectangular rapid flashing beacon warns motorists that pedestrians are within the crosswalk
        
	    Summary of work
	    
	      - Resurface Hwy 12 with a new asphalt road surface from west of Summerfield Dr. to First St. S
- Reconstruct or repair concrete curbs, gutters and side entries 
- Improve and update pedestrian access:       
	        
	          - Repair or add new sidewalk, includes bump outs
- Update pedestrian crosswalk signal systems at the intersections of: 
	            
	              - Hwy 12 and Co. Rd. 8 SW
- Hwy 12 and  Fourth St. S/Co. Rd. 62
 
 
Project home
    
      
        Montrose
        Hwy 12 work zone from east of Clementa Ave. to east of Zephyr Ave., Wright County.
        
        Current impacts
        Through late October
        Motorists
        
          - Hwy 12 open with one lane in each direction.
            
              - Expect narrow lanes, shoulder or turn lane closures
- Work will occur mostly between 7 a.m.- 7 p.m. on weekdays
 
Pedestrians
        
          - Sidewalk closures with signed routes 
Montrose is open
        Access to businesses and residents will be maintained and open; however, expect use of alternate entrances or side streets, includes sidewalk detours.        
        Work
        
          - Resurface Hwy 12 with a new asphalt surface from east of Clementa Ave. to east of Zephyr Ave. in Montrose
- Reconstruct or repair concrete curbs, gutters and entrances
-  Add a center turn lane at Zephyr  Ave. and Arizona Ave. in east Montrose to improve access.
- Reconstruct the Hwy 12 intersection at  Hwy 25 and Wright Co. Rd. 12/Buffalo Ave. S, to improve the truck turning radius and  pedestrian crosswalk
Project home